I&C a electro

Commissioning of 
steam turbines worldwide.

What are we solving?

Power plants

Coal and Combined cycle

District heating plants

Municipal Heating Plants, Incinerators, Cogeneration, Combined Cycles

Industry

Petrochemical industry
Paper industry, Woodworking industry, Sugar industry, Chemical industry, Waste management

Learn more

We provide flexible services during commissioning of the turbine islands in power plants, district heating plants and industrial power plants across a wide range of industries.


We are a partner in the field of control systems, turbine governors, field instrumentation and also in the electrical parts of turbine islands. We also have long-term experience with el. protection, synchronization, measurement and excitation systems of generators.

Provide a high grade of quality and professional services.

Stable and long-term cooperation with our clients.

A team of experienced technicians with long-term experience.

Services

Provided services

  • design
  • leading of commissioning tests
  • supervising of implementation teams – TFA (Technical Field Assistance)
  • Performing tests during commissioning
  • documentation for commissioning – test reports
  • As built documentation

Commissioning of I&C systems for steam turbine and after-sales service

  • SW Siemens – S7 Turloop, PCS7, T 3000
  • I&C  – HW part – check of cabling, field instrumentation, loop tests

Commissioning of electrical parts and after-sales service

  • DC / AC- MCC – cabling, setting, commissioning
  • electrical protection (generators, transformers, substations, lines) – setting, secondary and primary tests
  • synchronization – secondary and primary tests
  • Excitation systems – primary tests

References

Mondi Steti, Czech Republic

Industry – paper industry

Supervising the installation of cabling and field instrumentation for a steam turbine.

Siemens s.r.o.

2018

Gas to Gasoline, Turkmenistan

Industry – gas to gasoline plant

Commissioning of the Siemens S7 turloop steam turbine control system.

Siemens s.r.o.

2018-2019

Canfor Pulp Ltd.,Northwood, Kanada

Industry – wood processing

Canada – commissioning the Siemens S7 turloop steam turbine control system.

Siemens Canada Limited

2018-2019

Kronospan, Luxembourg

Industry – wood processing

Commissioning of the Siemens S7 turloop steam turbine control system.

Siemens s.r.o.

2019

Fibre Excellence Saint-Gaudens, France

Industry – wood processing

Commissioning of Siemens S7 turloop steam turbine control system.

Siemens s.r.o.

2020

GRATI, Indonesia

Power plants – combined cycle plant

Final check of the generator Siemens (230MVA) during commissioning.

Doosan Škoda Power s.r.o

2020

Malbork, Poland

Industry – sugarfactory

Final check of the cabling and assembly of the steam turbine electrical auxiliary systems.

Siemens Energy, s.r.o.

2020

REKO II, Netherlands

Industry – construction waste recycling

Cold and Hot commissioning of excitation system Siemens RG3-S for the generator Siemens 36,5MVA

Siemens Energy, s.r.o.

2020

Marine Corps Logistics Base Albany, USA

Power plant

Cold and Hot commissioning of I&C Siemens S7 turloop steam turbine control system.

Siemens Energy, Inc.

2020